As a professional China cement handicrafts manufacturers and cement ornaments suppliers, Yican Handicraft Factory mainly produces cement handicrafts and walks at the forefront of cement ornaments manufacturing. Over the years, product quality has become better and better, and the process has become more mature. There are more than one thousand products, including all kinds of exquisite cement pots, cement ornaments, cement hanging pieces, cement candlesticks, cement Buddha statues, terrazzo crafts and so on.

 

People can mix concrete in many different ways, but we will use the simplest and most reliable method I have found.

The 3: 1 ratio of ballast and cement used is very good for mixing concrete, because the 3: 1 mixture works well and will dry in 24 hours.

When starting to mix concrete, it is time to load the ballast and cement into the cement mixer. I suggest that you use the ballast to load the mixer first, and then load the cement. This will prevent the cement from sticking to the sides of the mixer.

Turn on the mixer and load the mixer with 3 piles of compaction iron wall hanging candle holder (or any size mixture you want to use), then add 1 pile of compaction cement shovel until the surrounding two materials stick together. Once mixed together, water needs to be added.

The amount of water is very important, so be careful when adding water for the first time, the ideal mixture consistency should be cream, and should slide smoothly around the cement mixer. Continue to add the right amount of water until you find the right consistency. Remember, it is important to use a small amount of concrete, because adding too much water will cause the mixture to become weak and not dry fast enough, which will also waste material. If it is too thick, many pores will be formed in the ornament.

Once the mixing is successful, the mold can be filled.

Step 2. Fill the mold
When filling the mold, it is best to place the cement mixer close enough to the vibrating table to make the artificial potted succulent of the mold more effective and easier. Open the vibrating table and prepare the required mold for filling.

For safety reasons, when placing the mold on the shaker, you may want to turn off the cement mixer when you take it into the jug.

You should gradually fill the mold while vibrating to reduce air bubbles at the artificial potted plant of the mold. When you gradually fill the mold, it is best to shake the mold and tap the mold on the workbench.

After the mold is completely filled, you only need to vibrate the mold for no more than 20 seconds, at which point you should be able to see the bubbles rising to the concrete surface.